Reply:

Once a report view has been saved, it can be scheduled to run at a designated time.

To schedule a report to run:

1. Go to the Settings menu in the navigation panel and select Event Schedule.

2. In the Event Schedules window, click Add Event.

3. In the Add Event to Schedule pop-up box, select the Report to Run from the saved custom reports listed in the pull-down menu.

4. Specify criteria for scheduling the event, and then click Save